São Paulo
Sabesp
03/22 - In Progress
Basic Design for Main Sewer Collector Lines, interconnections to existing sewerage networks, sewage pumping stations, pressurized lines and isolated interconnections for the Tietê Project – stage IV, sub-basins 21A and 22A of the TL-10 basin – Baquirivu River – Guaçu – Guarulhos Municipality.
Disign in BIM platform for pump stations and in Civil 3D for collectors.
- 14.4 km from Collectors;
- 02.6 km of interconnections.