São Paulo
SABESP
05/22 - In Progress
The scope of the project comprises the elaboration of the Basic Project of interceptor, trunk collectors, interconnections and isolated interconnections of the Tietê project – Stage IV. This sewage system, located in sub-basins 21A and 22A of the TL-10 basin, in Guarulhos, belongs to the sanitary sewage system of the Metropolitan Region of São Paulo.
The projects are planned for five trunk collectors (Juscelino Kubitschek, Parque das Nações, Água Chata, Dutra and Aracília) and an Interceptor (Bonsucesso) that direct the region’s sewage to the Bonsucesso ETE. Altogether, there are about 14.5km of collectors planned to drain an area of which they drain an area of 11.5km².