Rio de Janeiro
Holtec International
02/18 to 01/19 and 02/20 to 06/21
Basic and detailed design of the ISFSI Pad and Approach SLAB, Cabin and Access Control Warehouse, as well as geotechnical and topographic surveys, infrastructure for plant operation, such as transport path, landfills, drainage, water supply, sanitation and energy distribution and I&C. in addition to bidding documents and technical assistance for construction.
- Dry storage of fuels used by nuclear power plants.