Rondônia
Eletronorte
02/76 to 06/96
Studies, basic and executive designs, as well as management of the implementation of the Samuel Hydroelectric Power Plant, on the Jamari River, in the Amazon region and in the State of Rondônia.
- Installed power 216 MW
- 230 kV substation
- 45 km of transmission line
- Flood area of 560 km2
- 351,227 m3 of concrete
- 1,711,505 m3 of common excavation