São Paulo

Portobrás

09/71 to 07/75

Basic and Executive Design for the construction of the Railway Access on the left bank of the Port of Santos.

  • Railway line, mixed gauge
  • 28 km long
  • 5 railway yards with extension of 37 km.
  • Bridge over the Jurubatuba River: Length of 162 m, in six spans of 27 m
  • Bridge over the Mourão River: Length of 135 m, in five spans of 27 m
  • Via Ultrafértil and Pontilhão on the Maresias Stream: Design and construction of a pontilhão on the Maresias Stream and a 30 m long viaduct
  • Bridge over the Bertioga Canal: railway bridge, in coffin section, in stretches of three spans of 50 m, in continuous beam
  • Tunnel under Morro das Neves: 981 m long tunnel under Morro das Neves, with 45.90 m² of finished section

Share!

Send a message

I want to talk about my project!

Transport Sanitation Industry Housing Urbanization Energy Environment Irrigation Other segment