Studies of alternatives and Functional and Detailed Design for the SP 294 highway – Contorno de Pompéia – Paulópolis (20km).
Including 3 intersections, 10 viaducts and 2 bridges.
The design is done with the BIM (Building Information Modeling) methodology.